BIM Metrics

http://mystringlinks.blogspot.co.uk/2012/06/bim-metrics.html?goback=.gde_155077_member_126912110

“In the end, all metrics are driven by data. Data that can be reliably gathered
and analyzed in a standard format (read an extension of accounting rules). Until
the profession matures enough to settle on some data-driven processes, this
question of metrics will be one of many words, conferences and papers and a few
people who bravely go out and try something, anything to see what works. Those
brave few will be the ones that set the pace for the rest of the professions
years afterwards.”

Advertisements

About Shaun Farrell

I have been involved in the construction sector since 1986 and over the years I have seen things change dramatically. Much of the change has been directly as a result of technology. This blog will be about the key combinations of People, Process and Technology. Any views expressed here are strictly my own.
This entry was posted in Process, Tools and tagged . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s