#AU2012 #UKBimCrew SE2534-R – Successful Coordination on an Actual Project!

Overseen by Desiree Mackey, Martin/Martin Inc.

The rise of the BIM consultant. There to assist in the flow of data and process with the end objective of pruducing a smooth workflow.

The democratisation and commiditisation of architecture through BIM.

Responsibility Matrix, its an agreed list. Controls expectations.

All data gets binned eventually as specialist sub contractor info is kink.

Model components, structure and deck, architects beyond that.

From the contractor : please use the same coordinate systems, model only what is to be built e.g. partition studs only past ceilings, soffits between low and high ceilings, doors which include “super studs” for high walls (dont care about the door, cares about the sizes), show safety features, (its now law to include safety features in Australia).

NO as built model, an as fabricated model by the fabricators, there might be an as built scan.

Navis reviews should be part of the project procedure.

Advertisements

About Shaun Farrell

I have been involved in the construction sector since 1986 and over the years I have seen things change dramatically. Much of the change has been directly as a result of technology. This blog will be about the key combinations of People, Process and Technology. Any views expressed here are strictly my own.
This entry was posted in Event and tagged . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s