An area that I am keen to get a greater understanding of so that the “hooks” can be embedded at the correct points in design.

@fedenegro

Don Rudder, our CTO and I presented at RTC recently on our recent work implementing BIM for FM solutions. The presentation focused on what we’ve learned over the past year or so implementing custom workflows and tools within two hospital systems, the Porter Replacement Hospital in Porter, Indiana, and Children’s Hospital in Birmingham, Alabama. Both of these projects were done with the Contractor as a client, not the owner. In both cases, the contractor was acting as a proxy to the owner in helping them get the most out of what BIM they had developed to date, for downstream use during operations. I also want to point out that both projects are the brain child(ren?) of Aaron Wright, Hoar Construction’s BIM Director. It’s been his dedication to figure out the real application of a construction model during FM that brought us on board on both of those jobs.

View original post 438 more words

Advertisements

About Shaun Farrell

I have been involved in the construction sector since 1986 and over the years I have seen things change dramatically. Much of the change has been directly as a result of technology. This blog will be about the key combinations of People, Process and Technology. Any views expressed here are strictly my own.
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s